白鹿原电影完整版未删减版|谍战剧螳螂在线观看免费完整版|白银谷电视剧全集在线观看|黄河大侠电影高清完整版在线观看,致命弯道5电影完整版在线观看,91精品视频网站,翔田千里息与子的中出

Welcome to Nantong First Machinery Products Co.,Ltd
Language::Chinsesline  English

HOME > Support

Kneader use and safety matters

1. Before use, check the fasteners for looseness and clean up the debris in the mixing tank.



2. Check whether the electrical wiring is correct and the machine should have a ground wire.


3. The user must perform dry running before feeding, and check whether the operation of the host is consistent with the nameplate after the wiring of the host, the electric heating condition, the connection of the thermocouple on the temperature controller, and the display of the temperature control meter. The temperature controller is a temperature controller. The temperature controller only displays the temperature and temperature when the heating knob is turned on. The user must set the limit temperature on the temperature controller according to the process temperature.


4. The operation of the kneader is simple. First open the lid, feed, close the lid, and turn on the main unit to run. During the operation, the reversing and heating can be intermittently turned on.


5. When the kneading process is finished, the heating should be turned off first. When discharging is difficult, the starting motor is allowed to reverse to help discharge. At this time, the operator's hand is strictly prohibited from reaching into the cylinder.


CONTACT US

Nantong First Machinery Products Co.,Ltd

Tel:86-513-87540518 87540528

Mob:86-13906275512(Mr. GAO)

24H Service:86-18912214518

E-mail:info@ntfirst.com

Add.:No.28,Xindong Road,Dongchen Industry Park,Zhongshan East Road, Rugao City, Jiangsu Province